Finally planking is complete and we feel as though we are moving forward again. Keel and outer Stems are glued in place ready for some further shaping.
Read More..
Minggu, 18 Januari 2009
Minggu, 04 Januari 2009
Posted by apred on 06.38
with No comments so far
Correction!
So the two offending planks have now been removed (with a hot air gun as suggested by Chris). No chances are being taken second time around, with each mould removed one at a time and slots cut to receive two ribbands running the length of each side of the hull. One ribband to define a fair curve for the top of the sheer plank and one to pick up the lap between this and the lower plank.
Read More..
So the two offending planks have now been removed (with a hot air gun as suggested by Chris). No chances are being taken second time around, with each mould removed one at a time and slots cut to receive two ribbands running the length of each side of the hull. One ribband to define a fair curve for the top of the sheer plank and one to pick up the lap between this and the lower plank.
Like so many new jobs one learns from experience, and if we were starting off again I would follow the method recently described very well by Chris Perkins in Water Craft magazine (no. 73 Jan/Feb 09). Chris reduces all the mould sizes by the thickness of the ribbands and fits these along the course of the �lands� between each plank overlap. Whether or not this would be different in thicker ply I�m not sure but with 4mm it is well advised.
Langganan:
Postingan (Atom)